Land Clearing & Excavation Kissimmee & Clermont

Land clearing, grading, excavation or paving here in Orlando requires heavy machinery, skill, and experience to get the job done right. 

The quality of the project relies on the experience of the crew and quality equipment. Total site development from clearing the land, excavation, grading, and earthwork, to paving, and installation of the storm water and utility systems. 

No two properties are alike, each project has their unique set of challenges. With over 30 years of specializing in total site development in Central Florida, Swell Construction Group has seen it all. 

We are proud to provide our customers with a quality-finished project. This is achieved by having highly skilled personnel in all positions within our company. We provide accurate estimates and perform our scope of work in an efficient, timely, and a cost effective manner.

Why trust the professionals at Swell Construction Company?

The importance of proper water drainage

When the land isn’t graded properly water can flow towards a building. When water pools around a foundation the pressure can result in cracks and structural damage. Threatening the structural integrity of the building. 

Grading ensures water is being diverted correctly, which prevents land erosion and proper drainage. Whether it is a system of pitch angles, piping or swales, it can prevent flooding and a lot of headaches. It also takes neighboring properties into consideration, protecting them from flooding. 

Aesthetically pleasing landscape 

If you want the finished product to be appealing and function, then it takes heavy machinery to create a smooth surface. 

Sustainability 

When it comes to land clearing, excavation, and earth work, it is important to use environmentally friendly methods whenever it is possible. It starts with a specific plan designed for each unique property and project. Utilizing green materials and recycling, is good for the environment, but it is a great way to save money!

Affordable Orlando Site Clearing, Excavation & Paving

Preparing a property for construction here in Central Florida is no easy task. There a quite a few phases that are essential for a successful project.

Preparing a site for construction can include demolition of existing structures, removing hazardous materials and debris, clearing the land, grading, moving the earth, drainage, and paving. 

Site Evaluation 

After the site is analyzed and deemed suitable for your project, the shape and size, zoning regulations, and the slop. 

Geotechnical Testing 

Soil testing determines the characteristics, properties, and composition of the soil and rock beneath the surface. This should include a laboratory analysis, sampling of the groundwater, and soil. Testing the subsurface will determine the weight bearing capacity, strength, and how well the soil absorbs water. 

Site Plan Design 

Not only does this include entry for construction vehicles, temporary storage and access roads, but also, drainage systems, pipes and structures. 

Site Surveying 

Outlining where all the utilities, fixtures, and structures with markings to ensure everything fits together properly. It also designates if there are existing utilities or cables underneath the ground. 

Clearing and Grading 

This includes clearing the property of any existing structures, trees, roods, brush, and underground infrastructures. The ground is filled and leveled according to the specifications. 

Water runoff and drainage is very important in Central Florida. If the land is not properly graded the rainy season will be disastrous. Water will accumulate at the foundation, causing damage and even interior flooding

Site Compaction 

Compacting the soil takes specific equipment to ensure it can hold the weight of the foundation and building for years. 

Subgrading stabilization is responsible for the integrity of the entire project. This ensures there won’t be any caving or shifting and the topsoil is stabilized. This also means the buildings won’t experience structural damage or cracks in the future. 

Swell Construction Group is Central Florida’s leading ‘one stop shop’ for all your construction site prep work.

We specialize in land clearing, grading, earthwork, excavation, storm water system installation, utility systems installation, and paving. 

Since we own all of our equipment (over 130 pieces of heavy equipment), we ensure each one is properly maintained, which means you can depend on us for efficient and prompt excavation work.

Orlando/Kissimmee Land Clearing & Excavation

Do you need a piece of land cleared in Central Florida? Where Do You Start and what do you need to know? There are a number of things that go into land clearing and just as many issues to watch out for. 

Utility Issues 

Underground utilities, sewer lines and power cables, are not always clearly marked. Detecting them may not be easy. Digging up these utilities can be extremely dangerous. Which is why professional excavation does excess research before beginning the project. 

Tree Issues 

Small plants and trees may be easy to excavate and remove, but removing larger trees and their roots take a lot more that bulldozing. It takes the experience of a professional to tackle these issues. Roots need to be expected before removing the tree and safety needs to be addressed as removing large trees can be dangerous and cause extensive damage. 

Hazardous Materials 

Hazardous waste left on abandoned or vacant property is an especially big issue here in Central Florida. Often times this includes chemicals, garbage,  unwanted dangerous materials. These items need to be properly removed and disposed of. 

Water Issues 

Water sources located underground can be difficult to detect until you start digging. Soft ground can indicate an issue with water, which can be expensive to reroute to make the property buildable. It is important to have the property inspected before purchasing. 

Permit Issues 

Permits are required before excavation or site clearing can begin. To avoid any delays, make sure you have all the necessary information for the permits. 

Finding the right team of professionals in Central Florida is crucial. This couldn’t be more accurate when it comes to preparing your site for construction. Land clearing, grading, excavation, stormwater and utility installation system, and paving, must be done efficiently and with great attention to detail, to ensure a successful project. Hiring a reputable company is vital. 

As a leader in the industry, Swell Construction knows what it takes to get the job done right. Including over 130 pieces of heavy equipment, ensuring there is no job that is too big, from land clearing, excavation, dirt hauling, roads, utilities installation to surveying and much more.

We are proud to be Central Florida’s full service, licensed and bonded land development company specializing in residential, commercial and multi-family projects.

Steps for a Successful Central Florida Excavation & Site Clearing Project

Land clearing in Central Florida involves preparing a property for construction, including grading, earthwork, trenching, excavation, paving and storm water, utility systems installation, and other tasks involving heavy equipment. 

It just takes a small mistake at the excavation level, can mean a serious problem for the entire project. Make sure you take the necessary steps and choose the best contractor to ensure your project is a success. 

Excavation 

Most construction projects begin with grading. This involves learning about the property itself. From the types of soils, property lines, distance between structures, slopes on the land, the type of machinery that will be needed, getting the necessary permits, and many other topics. 

Before you hire an excavation team 

There are a few issues you should discuss with a potential excavation contractor before the project begins. Including, grubbing, clearing, sediment control and erosion. The last thing you want is an inspector to put your project on hold because of a problem. 

They also need to be aware of the specific ordinances and laws in the area about disposal of trees, brush, roots, and stumps. 

Hiring an excavation service 

Wiring the right team for the project is vital. Make sure they have the experience and equipment to get the job done right. For instance, there is a big difference between digging for a septic tank installation an clearing out a property for the construction of a housing community 

Make sure the company is insured, bonded, licensed and meets the industry standards. This may mean looking further than the price a company is quoting. There may be a reason for that low rate. 

Looking for an excavation service in Central Florida?

Swell Construction has a long history of commercial, multifamily, and single family residential site development, We have been working on projects in Central Florida since 1989, ranging in size from 1 to over 500 acres.

Our state-of-the-art estimating software system takes the guesswork out of proposal preparation and ensure the accuracy and fast response required by Owners. Our crews are the best there is, supported with the latest in technology and equipment.

Your Project Deserves The Best!

Swell Construction Company has an unmatched reputation. With customer service that is top tier and the highest quality work, we our proud of our reputation of performing under budget, on schedule, and with pride.

How To Choose The Right Site Clearing Service in Central Florida

Site and land clearing, grading, earthwork, excavation, paving and storm water and utility systems installation, are in high demand in Central Florida due to the development and construction taking place. 

As a leader in the industry, the professionals at Swell Construction properly prepare a plot of land for development. Whether it is for a single family home, multiple residents, or commercial needs, we ensure the site is cleared appropriately for a worthy investment. 

Why is professional site preparation so important?

It is the foundation for a successful project.  If not done properly, it can create years of problems.

If a site is not prepared properly before construction begins, the entire project can be compromised. Preparation includes land clearing, grading, proper compaction, soil stabilization, dewatering, excavation, paving, storm water and utility system installation. 

Water Drainage

Water runoff and drainage is very important in Central Florida. If the land is not properly graded the rainy season will be disastrous. Water will accumulate at the foundation, causing damage and even interior flooding. Grading is responsible for proper drainage.

Level Landscape

A smooth and level landscape is not only a significant aesthetic component, it is logistically important to the project.  You don’t want water rushing into a building every a big storm comes along, flooded the parking lot. 

Even Elevation

Slopes, hills, ditches, elevations are all important aspects of a construction project.  Though they may not look complex, there is quite a bit of science that goes into developing them. At Swell Construction we understand the requirements for each elevation, to ensure there won’t be any problems down the road. Walkways, terraces, driveways, streets, all demand suitable slopes. 

Professional grading is more that moving dirt around. A solid foundation sets the tone for the entire engineering plan, that leads to a successful project. 

Swell Construction Group is Central Florida’s leading ‘one stop shop’ for all your construction site prep work.