Steps for a Successful Central Florida Excavation & Site Clearing Project

Land clearing in Central Florida involves preparing a property for construction, including grading, earthwork, trenching, excavation, paving and storm water, utility systems installation, and other tasks involving heavy equipment. 

It just takes a small mistake at the excavation level, can mean a serious problem for the entire project. Make sure you take the necessary steps and choose the best contractor to ensure your project is a success. 

Excavation 

Most construction projects begin with grading. This involves learning about the property itself. From the types of soils, property lines, distance between structures, slopes on the land, the type of machinery that will be needed, getting the necessary permits, and many other topics. 

Before you hire an excavation team 

There are a few issues you should discuss with a potential excavation contractor before the project begins. Including, grubbing, clearing, sediment control and erosion. The last thing you want is an inspector to put your project on hold because of a problem. 

They also need to be aware of the specific ordinances and laws in the area about disposal of trees, brush, roots, and stumps. 

Hiring an excavation service 

Wiring the right team for the project is vital. Make sure they have the experience and equipment to get the job done right. For instance, there is a big difference between digging for a septic tank installation an clearing out a property for the construction of a housing community 

Make sure the company is insured, bonded, licensed and meets the industry standards. This may mean looking further than the price a company is quoting. There may be a reason for that low rate. 

Looking for an excavation service in Central Florida?

Swell Construction has a long history of commercial, multifamily, and single family residential site development, We have been working on projects in Central Florida since 1989, ranging in size from 1 to over 500 acres.

Our state-of-the-art estimating software system takes the guesswork out of proposal preparation and ensure the accuracy and fast response required by Owners. Our crews are the best there is, supported with the latest in technology and equipment.

Your Project Deserves The Best!

Swell Construction Company has an unmatched reputation. With customer service that is top tier and the highest quality work, we our proud of our reputation of performing under budget, on schedule, and with pride.

Orlando/Kissimmee/Clermont Excavation Service

Earthwork here in Central Florida is an essential component of construction. This specialized service ensures your property is suitable for building. They remove debris and move soil and dirt to establish the proper elevation for building, the soil is stable enough to support the weight of a building, to controlling erosion. 

The nature of this type of work is dangerous, which is why it requires expertise and experience. OHSA (Occupational Health & Safety Administration has extensive safety guidelines for excavation to protect the workers. 

Excavation contractors provide several services 

Grubbing and clearing 

This task takes place before excavation work begins. It  involves removing undergrowth, trees, shrubs, and stumps from the property. 

Rough Grading 

After the grubbing and clearing is complete, there will be areas that are low, that will need to be filled. While other sections will be high and the soil will need to be cut down. Rough grading is the process of “cutting and filling” is done prior to construction according to the civil plants. Which indicate the overlays and land elevations to make the property suitable for building. This requires the right equipment to ensure it is done properly. 

Trench Excavation 

Trench excavation, mostly involves digging ditches for the placement of underground utilities. The storm drain pipes, water line, sewer drains all need to be placed in a trench, then covered and compacted, and evened out, without any bumps or dips. Trenches are also used to divert water away from buildings to avoid erosion and flooding. 

There are many steps when it comes to preparing a site for construction, depending on the location, size and scope of the project. 

Each of these steps requires specific equipment to ensure the job gets done right. Swell Construction Group is Central Florida’s leading ‘one stop shop’ for all your construction site prep work.

Since we own all of our equipment (over 130 pieces of heavy equipment), we ensure each one is properly maintained, which means you can depend on us for efficient and prompt excavation work.

Contact Swell Construction for more information on your next project 

How To Choose The Right Site Clearing Service in Central Florida

Site and land clearing, grading, earthwork, excavation, paving and storm water and utility systems installation, are in high demand in Central Florida due to the development and construction taking place. 

As a leader in the industry, the professionals at Swell Construction properly prepare a plot of land for development. Whether it is for a single family home, multiple residents, or commercial needs, we ensure the site is cleared appropriately for a worthy investment. 

Why is professional site preparation so important?

It is the foundation for a successful project.  If not done properly, it can create years of problems.

If a site is not prepared properly before construction begins, the entire project can be compromised. Preparation includes land clearing, grading, proper compaction, soil stabilization, dewatering, excavation, paving, storm water and utility system installation. 

Water Drainage

Water runoff and drainage is very important in Central Florida. If the land is not properly graded the rainy season will be disastrous. Water will accumulate at the foundation, causing damage and even interior flooding. Grading is responsible for proper drainage.

Level Landscape

A smooth and level landscape is not only a significant aesthetic component, it is logistically important to the project.  You don’t want water rushing into a building every a big storm comes along, flooded the parking lot. 

Even Elevation

Slopes, hills, ditches, elevations are all important aspects of a construction project.  Though they may not look complex, there is quite a bit of science that goes into developing them. At Swell Construction we understand the requirements for each elevation, to ensure there won’t be any problems down the road. Walkways, terraces, driveways, streets, all demand suitable slopes. 

Professional grading is more that moving dirt around. A solid foundation sets the tone for the entire engineering plan, that leads to a successful project. 

Swell Construction Group is Central Florida’s leading ‘one stop shop’ for all your construction site prep work.

Orlando/Kissimmee Site Clearing & Grading

The natural process of soil erosion, where the soil is stripped away, is a monumental issue here in Central Florida. Due to the intense rain and winds. If the land is not properly graded in the initial construction phase, erosion first strips the topsoil from the property, then compacts the remaining soil. Once compacted, the soil cannot absorb water as it once could. Increasing the rate of erosion and putting you at risk for floods. 

Preventing problems from soil erosion 

While soil erosion is a natural process, through strategic grading and stormwater management, damage can be prevented, as well as costly repairs down the road.

Strategic grading 

The purpose of grading is to ensure the foundation for your project is level and stable, according to your project. For an optimal outcome, the elevation or slope is altered. There are many factors to take into account, such as irrigation, drainage, and erosion.  

Grading can decrease a slop that facilitates erosion. Stabilizing the ground by restructuring, cutting the land, and eliminating slopes. 

There are a variety of methods and equipment that goes into grading. Large machines are necessary, such as excavators, road graders, and drum rollers. It is vital for the grading contractor to be knowledgeable and familiar with the environment.

Stormwater Management 

Another major cause of erosion is stormwater and rain runoff. Well calculated site development will properly divert water into proper channels. If not done properly, the foundation is at risk of sliding or shifting. Creating an unstable and unsafe environment. The last thing you want is water to ooze into the foundation of a building and causing structural issues. 

Preventing erosion and stormwater management is vital for a stable base for your project. Which is why it is so important to hire a Central Florida grading contractor who is qualified and experienced. 

Kissimmee & Clermont Excavation & Site Clearing

The first step to most commercial construction projects in Central Florida, is site clearing and excavation. It involves preparing the property for development of the site. Including moving the art, removing trash, debris, trees, roots, and digging spaces for underground utilities. It also includes the very important step of redistributing and compacting the soil for stability and grading. 

Complete site development 

Commercial project typically requires more heavy equipment than smaller residential projects. At Swell Construction it is our responsibility to provide our customers with a quality-finished project. This is achieved by having highly skilled personnel in all positions within our company.

We are a full service, licensed and bonded land development company specializing in residential, commercial, and multi-family projects. 

We provide accurate estimates and perform our scope of work in an efficient, timely, and a cost effective manner.

Removing unwanted debris, contaminants, and materials 

 Depending on what the property was previously used for,  storage or manufacturing something, there could be some tricky elements. Such as underground tanks and piping, and contaminated soil. Nearby structures may also need to be taken into account. Such as their pressure and weight on the site. This is especially important in highly populated areas.

Trenching 

One of the most hazardous parts of the excavation, even more than removing contaminated materials. Trenching involves excavation for the installation of sewage systems and pipes. They require digging a trench that is deeper than it is wide. They can be deeper than five feet to over 20 feet deep. 

Preparing for construction 

Excavation is much more than removing unwanted materials and digging holes. It properly prepares the site for construction. They type of soil will affect the stability of the building. The excavation service you choose is responsible for ensuring he site is ready for construction, it will drain properly, and the buildings will be safe to inhabit. 

If you are looking for an excavation company in Central Florida, it is important to hire one with the experience necessary for your project.